To search again, click the Back button in your browser. Search results for: 2_151729_030000000.png
1 result found.
... :38 by Tony W posted: 15 Mar 2012 21:54 from: Tony W Hi Andy. It should look like this. I have also changed the box file title. Tony. Attachment: attach_1386_1813_herstmonceux_2012 _03_15_2052_26.box 204 posted: 15 Mar 2012 22:42 from: Martin Wynne Hi Andy, The lower C-8 turnout is a bit tight at 875mm rad. You can improve it significantly by changing to a C-9.5 with a curviform type of V-crossing. This increases the smallest rad to 1180mm: 2_151729_030000000.png That turnout was a bit too long for the existing template, so I merged it with the approach straight track to create a single transition template as easement from straight. I reduced it to a zero-length transition, and adjusted the transition markers to coincide with the previous template boundary. The C-9.5 turnout could then be roamed into position (CTRL+ F9 mouse action) until the exit aligned with the existing track. .box file attached below. regards, Martin. Attachment: attach_1387_1813_herstmonceux_c9p5 .box 191 posted: 16 ...
Search took 0.116 seconds Back to Templot Club |