To search again, click the Back button in your browser. Search results for: 2374_200548_520000000.jpg
1 result found.
... are secured by a CENTRAL bolt passing through a spacer block therefore the rail extends an equal number of timbers and CC's each side of the bolt. I will try to find pictures but this may not be untill later in the week. Wally posted: 20 May 2012 11:11 from: wally Having had a few moments this morning here are a couple of photos to add to the confusion. This installation is in the middle of a lot of plain track relaid 1949/1950 and will probably reflect the later thinking. 2374_200548_520000000.jpg This shows a pair of checks which only span 4 timbers and have a central locating bolt (only visible on the far rail and just out of shot on the near). 2374_200553_050000000.jpg Here we have a pair which spans 5 timbers with an offset retaining bolt and block and shows better the end on scarfing of two short timbers to form a longer one which was the subject of a previous discussion. This formation was made of second hand OO (97.5 lbs) rail as can be seen from the fshplate bolt holes in ...
Search took 0.103 seconds Back to Templot Club |