To search again, click the Back button in your browser. Search results for: 2849_021659_570000000.jpg
1 result found.
... run before I can do the Templot walk! The photo (which has been 'flipped' horizontally to match the track plan) shows the 3-way as being symmetrical but an asymmetric 3-way with the left-hand leading gives me more room to fit in the coal road (not to mention being easier to build!). I'm working on B7 crossings on both turnouts which give's me a good compromise in the space I have available. Thank you in advance for your generous assistance both here and on YMR! 2849_021659_570000000.jpg 2849_021700_430000000.jpg Edit: Sorry! I committed the usual sin and forgot to mention the track gauge which is 00-SF! Regards Bill posted: 3 Jan 2014 00:21 from: Alan Turner Mythocentric wrote: The photo (which has been 'flipped' horizontally to match the track plan) shows the 3-way as being symmetrical Sorry but the photo clearly shows a tandem turnout as the centre crossing is off-set. If it were a three throw turnout it would be central to the centre running lines. Alan ...
Search took 0.134 seconds Back to Templot Club |