Templot logo

Templot Club Archive - Search Results

To search again, click the Back button in your browser.


Search results for: 2_310713_080000000.png

2 results found.

Did you mean: Pink or Panic or pong?
... /H point blades do not flow into the stock rail properly. My R/H points blades are fine. Realistically it wont affect building the slip but I would like to know where I went wrong Hi Linton, For a neat result in the output, the switch templates need to overwrite the half-diamond templates. To make that happen, re-order the templates so that the half-diamond templates are above the switch templates in the storage box (i.e. have lower list numbers on the left): 2_310713_080000000.png Use the brown up/down arrows to move the templates with a D prefix above the templates with a S prefix. (I added a "single slip" prefix tag to your slip templates). Ideally, you could split each half-diamond template into 3 partial templates, removing the rails under the switch, but it's a lot of extra work for very little gain. 2. My track plan includes a passenger siding bay within one of the platforms. I specified a track spacing between adjacent track of 85mm ...
Terms matched: 1  -  Score: 8  -  51k  -  URL: https://85a.uk/templot/archive/topics/topic_2385.php
... down (I would expect them to be of constant thickness), whereas the original rails from the diamond are solid (I would expect them to be tapered, and have the planning length shown). Hi Adrian, For a neat result in the output, the switch templates need to overwrite the half-diamond templates. To make that happen, re-order the templates so that the half-diamond templates are above the switch templates in the storage box (i.e. have lower list numbers on the left): 2_310713_080000000.png Use the brown up/down arrows to move the templates with a D prefix above the templates with a S prefix. I need to work out which bits of rail need to be (electrically) bonded to each other, and which bits need to be switched (and hence isolated). The rules are the same as for all track formations -- all V-crossings need to be isolated from the surrounding rails and have their polarity switched. K-crossings do not need to be isolated or switched. In ...
Terms matched: 1  -  Score: 8  -  40k  -  URL: https://85a.uk/templot/archive/topics/topic_2424.php


Search took 0.166 seconds


Back to Templot Club