To search again, click the Back button in your browser. Search results for: 982_251458_520000000.jpg
1 result found.
... as I was given so much assistance with the plan. Built to 00sf through the crossings, then flared out to 00 gauge to match flexi track 982_251458_180000000.jpg I stick the plan to a building board, then tape tracing paper over it, followed by a few very thin strips of double-sided tape which is what I use to hold the sleepers to the paper. Don't put any tape where the tie-bars go. My prefered start place is from the Vee furthest on the right the work back with the next two 982_251458_520000000.jpg Most of the rails are now in place, though at this point just tacked to the sleepers in a few places for initial testing during the build Last edited on 25 Aug 2014 20:08 by Hayfield posted: 26 Aug 2014 17:56 from: Paul Boyd Hi "Hayfield" That looks good! Can I make one suggestion though? In the bottom photo you have a flangeway gauge to space the check rail from the stock rail. The critical dimension there is actually the distance from the crossing nose to the ...
Search took 0.115 seconds Back to Templot Club |