Templot logo

Templot Club Archive - Search Results

To search again, click the Back button in your browser.


Search results for: attach_292_458_RevisedLayout.JPG

1 result found.
... : 25 Jun 2008 06:42 from: Paul Hamilton Wow! Thanks Nigel and Martin! Some previous work on this design was developed by others primarily with a focus on prototypical MR/LMS period operations (ie minimimum facing points etc) and suggested the following schematic. This eliminates the slip and simplifies the details 2A and 2B with the inclusion of simply catch points also at these locations. I will eliminate the short siding from detail 3 and altered the pointwork slightly in detail 1 from what was originally shown. Attachment: attach_292_458_RevisedLayout.JPG 2036 posted: 25 Jun 2008 06:55 from: Paul Hamilton Additionally the following has been developed to aid operational planning and signalling with work having commenced on the construction of the operational and illuminated semaphores in line with the diagrams. There is a small area to finalise signalling wise on the the Matlock diagram but nothing that holds up construction. 2563267801_322ed787a1_o.jpg Hightor is the upper level station shown at the bottom of the track diagram. 2608529477_3ddc4fa78e_o.jpg East Tor is the east junction shown on the trackplan with the dotted lines indicating the hidden ...
Terms matched: 1  -  Score: 8  -  145k  -  URL: https://85a.uk/templot/archive/topics/topic_458.php


Search took 0.082 seconds


Back to Templot Club