author | remove search highlighting | ||
---|---|---|---|
posted: 19 May 2015 23:47 from: dave turner
click the date to link to this post click member name to view archived images |
A design issue. Assume you are designing a 1930's GWR or LMS passenger terminus (on the straight) consisting of 2 platforms (not island and standard way) with a scissors crossing for loco release via the empty platform. Let's assume Castle class loco's are in use. We want to use the minimum land area necessary. Let us further assume a minimum 3 carriages to work out lengths of platforms over and above clearance and headway to allow release. Now the 'how long is a piece of string' question - what prototypical switch/points/crossing configuration allows the minimum safe working length of the scissors crossing? Hmm! Any ideas? Dave |
||
posted: 20 May 2015 01:51 from: Martin Wynne
click the date to link to this post click member name to view archived images |
Hi Dave, If Castle class locos are using the crossover I doubt it would be anything shorter than B-8 and more likely C-10. Even then the platform edges will need a cut-back section to clear the loco overhangs while crossing over. Generally an arrangement such as you describe would be more typical of a suburban terminus, using smaller locomotives. For a main-line terminus a middle release road is more likely, or else incoming locomotives are released by the station pilot loco removing the stock to another platform, or to the carriage sidings. Alternatively, if space is very tight, you could try a loco traverser, as at Birmingham Moor Street? regards, Martin. |
||
posted: 20 May 2015 16:02 from: dave turner
click the date to link to this post click member name to view archived images |
Thanks Martin - should have thought of that. I was minimally describing the actual layout of platforms 4 & 5 at Shrewsbury station up until the early 60's before the big refit. I remember, albeit dimly, seeing Hall and Castle classes there but forgot that platforms 4 & 5 were used for the shorter trains on relatively local routes. Manor Class or Stanier Class 4P maybe? | ||
Last edited on 20 May 2015 16:10 by dave turner |
|||
posted: 20 May 2015 16:45 from: Martin Wynne
click the date to link to this post click member name to view archived images |
Hi Dave, 1961 before and after track plans of Shrewsbury here: topic 2610 regards, Martin. |
||
posted: 20 May 2015 19:55 from: dave turner
click the date to link to this post click member name to view archived images |
Thanks Martin - those are the ones, as well as the signal diagrams, that I'm working from. I'm using them, slowly, as an exercise to replicate the station in Templot. The idea being to improve my understanding of trackwork and Templot itself. I'll post more in the appropriate forum. Dave |
||
Please read this important note about copyright: Unless stated otherwise, all the files submitted to this web site are copyright and the property of the respective contributor. You are welcome to use them for your own personal non-commercial purposes, and in your messages on this web site. If you want to publish any of this material elsewhere or use it commercially, you must first obtain the owner's permission to do so. |