Templot Club forums powered for Martin Wynne by XenForo :

TEMPLOT 3D PLUG TRACK - To get up to speed with this experimental project click here.   To watch an introductory video click here.   See the User Guide at Bexhill West.

  • The Plug Track functions are experimental and still being developed. Some of the earlier pages of this topic are now out-of-date.

    For an updated overview of this project see this topic.   For some practical modelling aspects of using Plug Track see Building 3D Track.

    The assumption is that you have your own machines on which to experiment, or helpful friends with machines. Please do not send Templot files to commercial laser cutting or 3D printing firms while this project is still experimental, because the results are unpredictable and possibly wasteful.

    Some pages of this and other topics include contributions from members who are creating and posting their own CAD designs for 3D printing and laser-cutting. Do not confuse them with Templot's own exported CAD files. All files derived from Templot are © Martin Wynne.
  • The Plug Track functions are experimental and still being developed.

    For an updated overview of this project see this topic.   For some practical modelling aspects of using Plug Track see Building 3D Track.

    The assumption is that you have your own machines on which to experiment, or helpful friends with machines. Please do not send Templot files to commercial laser cutting or 3D printing firms while this project is still experimental, because the results are unpredictable and possibly wasteful.

    Some pages of this and other topics include contributions from members who are creating and posting their own CAD designs for 3D printing and laser-cutting. Do not confuse them with Templot's own exported CAD files. All files derived from Templot are © Martin Wynne.

Great Victoria Street Station

Quick reply >
Work at the SR7mm Group railway, of which I am a member, has seen Great Victoria Street services suspended whilst the permanent way team lifted the existing station throat to replace it with a new formation. This is a job laid over from winter 2020 due to the dreaded lurgy.

First, the connection to the Up and Down main lines was cut.
1669911111840.png


Seacoal Row, the locomotive servicing depot, and turntable, was removed.
1669911156184.png

1669911167339.png


The station approach/throat was then lifted.
1669911200688.png

1669911221543.png

1669911242935.png


Just in case any passengers were caught off guard with the suspension of services, official notices have been posted.
1669911277798.png


The following day, worked commenced on building the new point and crossing formation.
1669911301793.png


The section below was then transferred from my workbench to the railway. Yes, it did go in the car in one piece....just.
1669911344351.png


It was then connected to the platform and carriage siding lines.
1669911373777.png


The new scissors crossover was built on site and moved into position. This was a test to check alignments, hence the lack of check rails.
1669911433446.png


The joy of Templot, it all lines up with the original lie of the main lines.
1669911467982.png


Finally, the Up and Down main lines were reconnected. It was also an opportune moment to level them out as there was a bit of a dip where they entered the shed.
1669911496806.png


It will be a while before any work is commenced on Seacoal Row, as it allows access to the rear of the railway to install new signalling, position marked by the chopstick beyond the overbridge, as well as wiring up the new track.

Ian
 
_______________
message ref: 5474
Whoops, it's been a few months since I started this topic.....

State of play mid-December.
1686400949437.png


4th January 2023
1686401012613.png


Point motor installation commenced 15th January
1686401101526.png


January 18th 2023
Access to the Parcels Bay was via a kick-back siding, but was plagued with a kink in the track due to the original design. I took the opportunity to relay this and remove the kink. You can see the position of the original from the outline of the sleeper positions to the immediate right of the new length of plain track.
1686401303692.png


The new point being placed to check alignments. The rails beyond the two pairs of chairs at the toe end of the point will have a gentle curve in them before being fixed in place to align with the existing plain track. The short piece (panel) of track in the foreground will be replaced with a length of the correct size for final installation.
1686401386900.png


Early May saw the start of weathering rails prior to ballasting commencing.
1686401689028.png


There's a work/testing day tomorrow for the whole railway, so I'll take some more photos of the current state of the station trackwork.

Ian
 