bordercollie
Member
- Location
- Australia
Hi
I have progressed a bit further with timber shoving. I have designed the turnout carrage siding engine shed siding TR2206 on attached file with a curviform crossing but I am not sure if generic/regular or parallel would have been better. I can not remember why I selected curviform. I don't know if it was a mistake or whether there was a good reason. The main road and carriage siding are on a curve that starts at the exit of Tr2195. It looks OK visually to me but I am not sure if it is the best solution.
I have progressed a bit further with timber shoving. I have designed the turnout carrage siding engine shed siding TR2206 on attached file with a curviform crossing but I am not sure if generic/regular or parallel would have been better. I can not remember why I selected curviform. I don't know if it was a mistake or whether there was a good reason. The main road and carriage siding are on a curve that starts at the exit of Tr2195. It looks OK visually to me but I am not sure if it is the best solution.
Attachments
message ref: 1462