James
Member
- Location
- Hampshire, UK
Good evening,
I am hoping someone may be kind enough to help.
I have attached the plan of Ropley (pre-preservation) with a map/picture I'm using to lay the track over (I hope I've attached the correct files to be able to see what I've been doing). I thought I'd made a reasonable stab at the plan and thought any issues with the 3-way turnout - that I always struggle with - I'd be able to resolve while making the turnout. This wasn't to be the case sadly and the turnout, although functional, did not align with the central track / siding coming off the turnout. This is meant to be straight (or very slightly curved) and this should continue through a straight central road in the tandem.
I can't work out how to adapt the turnout so it both aligns with all the tracks and is flowing / straight through the central road into the siding.
Would someone be able to have a look and tell me how to correct it if possible?
Many thanks in advance,
James
I am hoping someone may be kind enough to help.
I have attached the plan of Ropley (pre-preservation) with a map/picture I'm using to lay the track over (I hope I've attached the correct files to be able to see what I've been doing). I thought I'd made a reasonable stab at the plan and thought any issues with the 3-way turnout - that I always struggle with - I'd be able to resolve while making the turnout. This wasn't to be the case sadly and the turnout, although functional, did not align with the central track / siding coming off the turnout. This is meant to be straight (or very slightly curved) and this should continue through a straight central road in the tandem.
I can't work out how to adapt the turnout so it both aligns with all the tracks and is flowing / straight through the central road into the siding.
Would someone be able to have a look and tell me how to correct it if possible?
Many thanks in advance,
James
Attachments
message ref: 3773