I feel sure this (or something very similar) has been covered before but can't find a thread which seems to cover it exactly.  So, apologies in advance if the answer is already out there somewhere.
Always looking for space-saving arrangements I was considering replacing one (or more) turnout(s) in a  scissors crossover with slips.  But the problem seems to be a conflict between the slip switches and the central diamond V-crossings.  On the basis that a picture is worth a thousand words I've attached a box file showing two double slips joined as one half of a scissors crossover.
Am I trying to create an impossible arrangement that would not be used in prototype practice; or is there a way of achieving this?
Any help will be much appreciated.
Stuart

Attachment: attach_1554_2126_DoubleSlip-20ft-B8.box     212

posted: 22 Dec 2012 23:13

from:

Martin Wynne
 
West Of The Severn - United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
stuart1600 wrote:
But the problem seems to be a conflict between the slip switches and the central diamond V-crossings.
Hi Stuart,

A curved 1:8 diamond with fixed K-crossings is asking for trouble, especially with the wide GOG-F flangeways. 1:8 is the limit for fixed K-crossings, and then only in straight track. I would strongly recommend changing to a switch-diamond for the slips. Have you considered using 0-MF instead?    

The V-crossings on the slips can barely be checked properly because of the conflicting diamond rails. By reducing the 90mm track centres a little you may find the check rails fit better.

The points of the slip switch need to clear the wing rail on the middle V-crossing. To achieve this you need to move the switch sufficiently to clear. This will shorten the slip road and reduce its radius -- another reason to use a switch diamond (i.e. no K-crossing check rails for the slip road to conflict). The outer switch on the same side will need to be moved in by a similar amount so that the slip road radius will align correctly.

The timbering and chairing of the slip switches would need some careful thought, but the rail geometry appears to be possible. It's not unknown as a prototype formation.

regards,

Martin.

posted: 24 Dec 2012 09:58

from:

stuart1600
 
United Kingdom

click the date to link to this post
click member name to view archived images
view images in gallery view images as slides
Martin Wynne wrote:
A curved 1:8 diamond with fixed K-crossings is asking for trouble, especially with the wide GOG-F flangeways. 1:8 is the limit for fixed K-crossings, and then only in straight track. I would strongly recommend changing to a switch-diamond for the slips. Have you considered using 0-MF instead?    

The V-crossings on the slips can barely be checked properly because of the conflicting diamond rails. By reducing the 90mm track centres a little you may find the check rails fit better.

The points of the slip switch need to clear the wing rail on the middle V-crossing. To achieve this you need to move the switch sufficiently to clear. This will shorten the slip road and reduce its radius ...
Thanks for this comprehensive reply Martin.
I was fairly confident that I could see what the problems were, but I was struggling to identify the solutions!
From previous threads on this forum I recalled that 1:8 was the limit for fixed K-crossings, but hadn't noted that this applied to straight track.  I could probably change to 1:7, and even with the slip switches moved in a bit could still keep an acceptable radius on the inner slip roads (i.e. at least 6ft).
I'm intrigued by your suggestion of reducing the track centres; I had assumed that if anything I would have had to increase them to resolve the conflicts - I shall have a play with that and see what happens.
Similarly with 0-MF, which I am considering despite it seeming to be counter-intuitive to make the gauge even narrower. (but going the other way to S7 is definitely out, not least because I own too many wheels!)  I do have one scratchbuilt loco with Alan Harris wheels set to 29.4 b-to-b and I will need to check if this is happy with the crucial "check rail to opposite rail-face" measurement in 0-MF.
So, all in all quite a few parameters to play around with, and some useful additions to my knowledge of trackwork.
Again many thanks for your help, and all best wishes for Christmas and the New Year.
Stuart



Templot Club > Forums > Templot talk > Slips and scissors crossings
about Templot Club

Templot Companion - User Guide - A-Z Index Templot Explained for beginners Please click: important information for new members and first-time visitors.
indexing link for search engines

back to top of page


Please read this important note about copyright: Unless stated otherwise, all the files submitted to this web site are copyright and the property of the respective contributor. You are welcome to use them for your own personal non-commercial purposes, and in your messages on this web site. If you want to publish any of this material elsewhere or use it commercially, you must first obtain the owner's permission to do so.
The small print: All material submitted to this web site is the responsibility of the respective contributor. By submitting material to this web site you acknowledge that you accept full responsibility for the material submitted. The owner of this web site is not responsible for any content displayed here other than his own contributions. The owner of this web site may edit, modify or remove any content at any time without giving notice or reason. Problems with this web site? Contact webmaster@templot.com.   This web site uses cookies: click for information.  
© 2020  

Powered by UltraBB - © 2009 Data 1 Systems